1,045
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IA0419 #10 Y:2007 | 10 | 2007 | Utilize energy-efficient belts and other improved mechanisms | $2,325 | $800 | |
| IA0419 #09 Y:2007 | 09 | 2007 | Recover waste heat from equipment | $2,583 | $3,300 | |
| IA0419 #08 Y:2007 | 08 | 2007 | Optimize plant power factor | $19,032 | $19,062 | |
| IA0419 #07 Y:2007 | 07 | 2007 | Turn off equipment during breaks, reduce operating time | $5,450 | $1,200 | |
| IA0419 #06 Y:2007 | 06 | 2007 | Utilize higher efficiency lamps and/or ballasts | $4,515 | $7,460 | |
| IA0419 #05 Y:2007 | 05 | 2007 | Install occupancy sensors | $758 | $1,001 | |
| IA0419 #04 Y:2007 | 04 | 2007 | Use most efficient type of electric motors | $1,431 | $174 | |
| IA0419 #03 Y:2007 | 03 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,055 | $500 | |
| IA0419 #02 Y:2007 | 02 | 2007 | Reduce the pressure of compressed air to the minimum required | $678 | $25 | |
| IA0419 #01 Y:2007 | 01 | 2007 | Use insulation in furnaces to facilitate heating / cooling | $4,302 | $1,140 | |
| LE0265 #09 Y:2007 | 09 | 2007 | Utilize higher efficiency lamps and/or ballasts | $22,557 | $58,273 | |
| LE0265 #08 Y:2007 | 08 | 2007 | Minimize use of outside make-up air for ventilation except when used for economizer cycle | $429 | $600 | |
| LE0265 #07 Y:2007 | 07 | 2007 | Reduce the pressure of compressed air to the minimum required | $623 | $200 | |
| LE0265 #06 Y:2007 | 06 | 2007 | Install partitions to reduce size of conditioned space | $594 | - | |
| LE0265 #05 Y:2007 | 05 | 2007 | Use / purchase optimum sized compressor | $3,558 | - | |
| LE0265 #04 Y:2007 | 04 | 2007 | Use properly designed and sized hvac equipment | $5,367 | $46 | |
| LE0265 #03 Y:2007 | 03 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,608 | $860 | |
| LE0265 #02 Y:2007 | 02 | 2007 | Install timers and/or thermostats | $10,266 | $2,250 | |
| LE0265 #01 Y:2007 | 01 | 2007 | Utilize outside contracting | $45,000 | $7,800 | |
| WV0366 #16 Y:2007 | 16 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $667 | $282 |