Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

781

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Industrial machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2218 #01 Y:2022 Reduce the pressure of compressed air to the minimum required $1,995 -
CM1006 #07 Y:2022 Lower light fixtures in high ceiling areas $29,546 $160,998
CM1006 #06 Y:2022 Apply for tax-free status for energy purchases $4,160 $8,000
CM1006 #05 Y:2022 Use or replace with energy efficient substitutes $156 $500
CM1006 #04 Y:2022 Install heat pipes / raise cooling setpoint $118 -
CM1006 #03 Y:2022 Make a practice of turning off lights when not needed $454 $25
CM1006 #02 Y:2022 Adjust / maintain fork lift trucks for most efficient operation $2,098 $10,625
CM1006 #01 Y:2022 Use solar heat to make electricty $30,400 $894,000
IC0249 #05 Y:2021 Recharge batteries on during off-peak demand periods $2,067 -
IC0249 #04 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $16,062 $18,089
IC0249 #03 Y:2021 Install compressor air intakes in coolest locations $1,949 $440
IC0249 #02 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $11,374 $4,100
IC0249 #01 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $5,457 $154
SU0504 #06 Y:2021 Install occupancy sensors $139 $601
SU0504 #05 Y:2021 Use or replace with energy efficient substitutes $211 $371
SU0504 #04 Y:2021 Use or replace with energy efficient substitutes $421 $569
SU0504 #03 Y:2021 Reduce ventilation air $1,725 $882
SU0504 #02 Y:2021 Eliminate/reduce an operation $515 $50
SU0504 #01 Y:2021 Reduce the pressure of compressed air to the minimum required $97 -
BS0144 #06 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $1,776 $452