Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Rubber product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CC0038 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $2,471 $1,560
CC0038 #07 Y:2024 Use cooling tower water instead of refrigeration $10,304 $24,675
CC0038 #06 Y:2024 Eliminate cooling of process streams which subsequently must be heated and vice versa $8,129 $6,200
CC0038 #05 Y:2024 Use solar heat to make electricty $143,864 $738,776
CC0038 #04 Y:2024 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $34,175 -
CC0038 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $21,339 $20,000
CC0038 #02 Y:2024 Install smaller boiler (increase high fire duty cycle) $48,942 $14,000
CC0038 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $68,643 $40,000
NC0399 #10 Y:2010 Insulate bare equipment $1,592 $2,600
NC0399 #09 Y:2010 Analyze flue gas for proper air/fuel ratio $16,805 $6,000
NC0399 #08 Y:2010 Install / repair insulation on steam lines $4,744 $1,550
NC0399 #07 Y:2010 Preheat boiler makeup water with waste process heat $6,943 $8,852
NC0399 #06 Y:2010 Develop a repair/replace policy $7,151 $23,576
NC0399 #05 Y:2010 Utilize higher efficiency lamps and/or ballasts $17,471 -
NC0399 #04 Y:2010 Insulate bare equipment $1,429 $5,438
NC0399 #03 Y:2010 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $40,261 -
NC0399 #02 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $330 $200
NC0399 #01 Y:2010 Use / purchase optimum sized compressor $1,597 $100
NC0339 #08 Y:2006 Utilize higher efficiency lamps and/or ballasts $15,369 $50
NC0339 #07 Y:2006 Utilize higher efficiency lamps and/or ballasts $1,136 $1,407