26
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CC0038 #08 Y:2024 | 08 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $2,471 | $1,560 |
n/a
|
| CC0038 #07 Y:2024 | 07 | 2024 | Use cooling tower water instead of refrigeration | $10,304 | $24,675 |
n/a
|
| CC0038 #06 Y:2024 | 06 | 2024 | Eliminate cooling of process streams which subsequently must be heated and vice versa | $8,129 | $6,200 |
n/a
|
| CC0038 #05 Y:2024 | 05 | 2024 | Use solar heat to make electricty | $143,864 | $738,776 |
n/a
|
| CC0038 #04 Y:2024 | 04 | 2024 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $34,175 | - |
n/a
|
| CC0038 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $21,339 | $20,000 |
n/a
|
| CC0038 #02 Y:2024 | 02 | 2024 | Install smaller boiler (increase high fire duty cycle) | $48,942 | $14,000 |
n/a
|
| CC0038 #01 Y:2024 | 01 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $68,643 | $40,000 |
n/a
|
| NC0399 #10 Y:2010 | 10 | 2010 | Insulate bare equipment | $1,592 | $2,600 | |
| NC0399 #09 Y:2010 | 09 | 2010 | Analyze flue gas for proper air/fuel ratio | $16,805 | $6,000 | |
| NC0399 #08 Y:2010 | 08 | 2010 | Install / repair insulation on steam lines | $4,744 | $1,550 | |
| NC0399 #07 Y:2010 | 07 | 2010 | Preheat boiler makeup water with waste process heat | $6,943 | $8,852 | |
| NC0399 #06 Y:2010 | 06 | 2010 | Develop a repair/replace policy | $7,151 | $23,576 | |
| NC0399 #05 Y:2010 | 05 | 2010 | Utilize higher efficiency lamps and/or ballasts | $17,471 | - | |
| NC0399 #04 Y:2010 | 04 | 2010 | Insulate bare equipment | $1,429 | $5,438 | |
| NC0399 #03 Y:2010 | 03 | 2010 | Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $40,261 | - | |
| NC0399 #02 Y:2010 | 02 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $330 | $200 | |
| NC0399 #01 Y:2010 | 01 | 2010 | Use / purchase optimum sized compressor | $1,597 | $100 | |
| NC0339 #08 Y:2006 | 08 | 2006 | Utilize higher efficiency lamps and/or ballasts | $15,369 | $50 | |
| NC0339 #07 Y:2006 | 07 | 2006 | Utilize higher efficiency lamps and/or ballasts | $1,136 | $1,407 |