35
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK1077 #05 Y:2022 | 05 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $7,559 | $9,108 | |
| OK1077 #04 Y:2022 | 04 | 2022 | Install outside air damper / economizer on hvac unit | $2,586 | $7,371 | |
| OK1077 #03 Y:2022 | 03 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $530 | $347 | |
| OK1077 #02 Y:2022 | 02 | 2022 | Use solar heat to make electricty | $24,215 | $230,880 | |
| OK1077 #01 Y:2022 | 01 | 2022 | Utilize higher efficiency lamps and/or ballasts | $3,255 | $7,590 | |
| OK0932 #14 Y:2015 | 14 | 2015 | Shut off steam traps on super heated steam lines when not in use | $4,116 | - | |
| OK0932 #13 Y:2015 | 13 | 2015 | Repair and eliminate steam leaks | $4,272 | $1,100 | |
| OK0932 #12 Y:2015 | 12 | 2015 | Operate boilers on high fire setting | $16,492 | - | |
| OK0932 #11 Y:2015 | 11 | 2015 | Use insulation in furnaces to facilitate heating / cooling | $3,216 | $871 | |
| OK0932 #10 Y:2015 | 10 | 2015 | Use waste heat from hot flue gases to preheat | $6,093 | $30,000 | |
| OK0932 #09 Y:2015 | 09 | 2015 | Analyze flue gas for proper air/fuel ratio | $429 | - | |
| OK0932 #08 Y:2015 | 08 | 2015 | Use cooling tower or economizer to replace chiller cooling | $3,679 | $12,315 | |
| OK0932 #07 Y:2015 | 07 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $240 | $125 | |
| OK0932 #06 Y:2015 | 06 | 2015 | Install compressor air intakes in coolest locations | $52 | $175 | |
| OK0932 #05 Y:2015 | 05 | 2015 | Recover waste heat from equipment | $481 | $460 | |
| OK0932 #04 Y:2015 | 04 | 2015 | Reduce space conditioning during non-working hours | $1,740 | $2,829 | |
| OK0932 #03 Y:2015 | 03 | 2015 | Use radiant heater for spot heating | $3,703 | $11,940 | |
| OK0932 #02 Y:2015 | 02 | 2015 | Utilize higher efficiency lamps and/or ballasts | $5,916 | $7,335 | |
| OK0932 #01 Y:2015 | 01 | 2015 | Utilize higher efficiency lamps and/or ballasts | $5,787 | $14,515 | |
| MZ0190 #08 Y:2015 | 08 | 2015 | Reduce the pressure of compressed air to the minimum required | $6,028 | $1,500 |