Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Synthetic rubber manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2417 #07 Y:2024 Use solar heat to make electricty $63,875 $514,800
LS2417 #06 Y:2024 Use most efficient type of electric motors $33,694 $120,300
LS2417 #05 Y:2024 Upgrade controls on compressors $9,379 $28,000
LS2417 #04 Y:2024 Replace fossil fuel equipment with electrical equipment $182,554 $481,830
LS2417 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $82,069 $99,800
LS2417 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,173 $90
LS2417 #01 Y:2024 Utilize daylight whenever possible in lieu of artificial light $1,135 $75
LS1801 #03 Y:2017 Optimize plant power factor $54,034 -
LS1801 #02 Y:2017 Reduce the pressure of compressed air to the minimum required $17,691 -
LS1801 #01 Y:2017 Analyze flue gas for proper air/fuel ratio $69,575 -
AM0701 #09 Y:2016 Insulate bare equipment $1,325 $1,200
AM0701 #08 Y:2016 Reduce illumination to minimum necessary levels $3,420 $210
AM0701 #07 Y:2016 Utilize higher efficiency lamps and/or ballasts $9,900 $22,740
AM0701 #06 Y:2016 Use synthetic lubricant $35,540 -
AM0701 #05 Y:2016 Optimize plant power factor $36,800 $61,950
AM0701 #04 Y:2016 Pay utility bills on time $57,500 -
AM0701 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $73,125 $105,700
AM0701 #02 Y:2016 Analyze flue gas for proper air/fuel ratio $195,000 $2,000
AM0701 #01 Y:2016 Repair or replace steam traps $515,000 $75,000