Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,357

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Converted paper product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0102 #05 Y:2005 Repair and eliminate steam leaks $16,902 $2,200
IC0102 #04 Y:2005 Analyze flue gas for proper air/fuel ratio $5,597 -
IC0102 #03 Y:2005 Install / repair insulation on steam lines $9,426 $6,213
IC0102 #02 Y:2005 Use waste heat from hot flue gases to preheat $14,439 $54,000
IC0102 #01 Y:2005 Move boiler to more efficient location $39,466 $3,500
TA0096 #09 Y:2005 Reduce the pressure of compressed air to the minimum required $175 -
TA0096 #08 Y:2005 Utilize daylight whenever possible in lieu of artificial light $645 -
TA0096 #07 Y:2005 Utilize higher efficiency lamps and/or ballasts $890 -
TA0096 #06 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $2,040 $500
TA0096 #05 Y:2005 Use adjustable frequency drive or multiple speed motors on existing system $5,525 $7,400
TA0096 #04 Y:2005 Use optimum size and capacity equipment $8,870 $13,400
TA0096 #03 Y:2005 Recover waste heat from equipment $11,500 $2,340
TA0096 #02 Y:2005 Replace existing equipment with more suitable substitutes $12,700 $5,330
TA0096 #01 Y:2005 Install partitions to reduce size of conditioned space $13,200 $25,840
BD0288 #13 Y:2005 Use closed cycle process to minimize waste water production $1,651 $1,250
BD0288 #12 Y:2005 Install occupancy sensors $677 $375
BD0288 #11 Y:2005 Utilize higher efficiency lamps and/or ballasts $1,154 $2,480
BD0288 #10 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $1,050 $300
BD0288 #09 Y:2005 Recover waste heat from equipment $712 $1,000
BD0288 #08 Y:2005 Repair and eliminate steam leaks $2,844 $2,400