Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,357

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Converted paper product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WI0494 #01 Y:2005 Use optimum size and capacity equipment $3,360 $11,500
LE0213 #08 Y:2005 Utilize higher efficiency lamps and/or ballasts $8,210 $53,880
LE0213 #07 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $3,384 $200
LE0213 #06 Y:2005 Install compressor air intakes in coolest locations $4,694 $2,000
LE0213 #05 Y:2005 Utilize energy-efficient belts and other improved mechanisms $4,792 $1,000
LE0213 #04 Y:2005 Shift from daytime to nighttime operation $5,279 $368
LE0213 #03 Y:2005 Change rate schedules or other changes in utility service $9,703 $25,000
LE0213 #02 Y:2005 Turn off equipment when not in use $22,533 $6,000
LE0213 #01 Y:2005 Reduce the pressure of compressed air to the minimum required $24,825 $1,344
IC0102 #16 Y:2005 Disconnect ballasts $29,539 $2,208
IC0102 #15 Y:2005 Upgrade controls on compressors $669 $168
IC0102 #14 Y:2005 Utilize controls to operate equipment only when needed $10,924 $2,500
IC0102 #13 Y:2005 Reduce the pressure of compressed air to the minimum required $3,019 $220
IC0102 #12 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $8,208 $5,000
IC0102 #11 Y:2005 Check for accuracy of utility / power meters $10,135 $10,152
IC0102 #10 Y:2005 Use waste heat from hot flue gases to preheat $24,250 $52,000
IC0102 #09 Y:2005 Keep boiler tubes clean $3,862 $776
IC0102 #08 Y:2005 Close off unneeded steam lines $329 $384
IC0102 #07 Y:2005 Install steam trap $542 $2,142
IC0102 #06 Y:2005 Increase amount of condensate returned $1,738 $1,200