Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Veneer, plywood, and engineered wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CO0657 #05 Y:2012 Use solar heat to make electricty $2,460 $35,000
CO0657 #04 Y:2012 Utilize higher efficiency lamps and/or ballasts $460 $510
CO0657 #03 Y:2012 Install timers and/or thermostats $460 -
CO0657 #02 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $2,840 $350
CO0657 #01 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $24,210 $77,390
CO0576 #08 Y:2005 Utilize higher efficiency lamps and/or ballasts $920 $1,440
CO0576 #07 Y:2005 Recover waste heat from equipment $1,740 $980
CO0576 #06 Y:2005 Improve air circulation with destratification fans / other methods $4,670 $9,240
CO0576 #05 Y:2005 Replace existing hvac unit with high efficiency model $6,190 $17,170
CO0576 #04 Y:2005 Utilize outside air instead of conditioned air for drying $200 $170
CO0576 #03 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $2,540 $190
CO0576 #02 Y:2005 Shift from daytime to nighttime operation $4,450 -
CO0576 #01 Y:2005 Install rotating carousels to reduce set-up times $84,000 $30,670