Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Veneer, plywood, and engineered wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0515 #08 Y:2021 Install occupancy sensors $1,832 $3,388
AS0515 #07 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $3,242 $7,928
AS0515 #06 Y:2021 Apply for tax-free status for energy purchases $27,420 $500
AS0515 #05 Y:2021 Use solar heat to make electricty $6,571 $72,520
AS0515 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $18,528 $28,033
AS0515 #03 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $21,340 $9,935
AS0515 #02 Y:2021 Replace fossil fuel equipment with electrical equipment $30,224 $146,764
AS0515 #01 Y:2021 Increase amount of waste recovered for resale $125,792 $20,098
AS0407 #04 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $744 $2,000
AS0407 #03 Y:2005 Reduce the pressure of compressed air to the minimum required $989 $2,000
AS0407 #02 Y:2005 Use solar heat to heat water $1,251 $3,200
AS0407 #01 Y:2005 Install equipment to move product $257,790 $218,456
AS0344 #07 Y:2002 Use most efficient type of electric motors $1,260 $1,751
AS0344 #06 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $68 $167
AS0344 #05 Y:2002 Replace existing chiller with high efficiency model $82 $356
AS0344 #04 Y:2002 Turn off equipment during breaks, reduce operating time $473 $21
AS0344 #03 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $3,587 $10,835
AS0344 #02 Y:2002 Reduce the pressure of compressed air to the minimum required $512 $5,250
AS0344 #01 Y:2002 Utilize higher efficiency lamps and/or ballasts $1,169 $6,136