681
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0521 #11 Y:2007 | 11 | 2007 | Use or replace with energy efficient substitutes | $1,900 | $1,800 | |
| OR0521 #10 Y:2007 | 10 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $1,600 | $4,500 | |
| OR0521 #09 Y:2007 | 09 | 2007 | Install occupancy sensors | $3,720 | $5,100 | |
| OR0521 #08 Y:2007 | 08 | 2007 | Utilize higher efficiency lamps and/or ballasts | $5,250 | $9,300 | |
| OR0521 #07 Y:2007 | 07 | 2007 | Upgrade controls on compressors | $7,100 | $45,000 | |
| OR0521 #06 Y:2007 | 06 | 2007 | Reduce the pressure of compressed air to the minimum required | $7,300 | - | |
| OR0521 #05 Y:2007 | 05 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,600 | $9,600 | |
| OR0521 #04 Y:2007 | 04 | 2007 | Turn off equipment when not in use | $27,800 | $12,500 | |
| OR0521 #03 Y:2007 | 03 | 2007 | Utilize energy-efficient belts and other improved mechanisms | $27,300 | - | |
| OR0521 #02 Y:2007 | 02 | 2007 | Size electric motors for peak operating efficiency | $37,000 | $20,600 | |
| OR0521 #01 Y:2007 | 01 | 2007 | Flash condensate to produce lower pressure steam | $92,300 | $44,300 | |
| OR0519 #13 Y:2007 | 13 | 2007 | Install skylights | $37,300 | $170,250 | |
| OR0519 #12 Y:2007 | 12 | 2007 | Recycle air for heating, ventilation and air conditioning | $11,500 | $16,000 | |
| OR0519 #11 Y:2007 | 11 | 2007 | Optimize filtration cleaning / replacement to minimize air resistance | $16,700 | $5,100 | |
| OR0519 #10 Y:2007 | 10 | 2007 | Use or replace with energy efficient substitutes | $42,000 | $61,300 | |
| OR0519 #09 Y:2007 | 09 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $47,500 | $109,300 | |
| OR0519 #08 Y:2007 | 08 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,400 | $12,400 | |
| OR0519 #07 Y:2007 | 07 | 2007 | Upgrade controls on compressors | $52,800 | $40,500 | |
| OR0519 #06 Y:2007 | 06 | 2007 | Utilize controls to operate equipment only when needed | $102,000 | $33,700 | |
| OR0519 #05 Y:2007 | 05 | 2007 | Use waste heat from hot flue gases to preheat | $16,700 | $35,900 |