24
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK0792 #11 Y:2010 | 11 | 2010 | Replace existing hvac unit with high efficiency model | $5,037 | $78,057 | |
| OK0792 #10 Y:2010 | 10 | 2010 | Use proper thickness of insulation on building envelope | $6,203 | $109,200 | |
| OK0792 #09 Y:2010 | 09 | 2010 | Insulate bare equipment | $156 | $143 | |
| OK0792 #08 Y:2010 | 08 | 2010 | Install / repair insulation on steam lines | $304 | $902 | |
| OK0792 #07 Y:2010 | 07 | 2010 | Optimize plant power factor | $1,160 | $11,630 | |
| OK0792 #06 Y:2010 | 06 | 2010 | Reduce illumination to minimum necessary levels | $741 | $644 | |
| OK0792 #05 Y:2010 | 05 | 2010 | Utilize higher efficiency lamps and/or ballasts | $1,607 | $8,168 | |
| OK0792 #04 Y:2010 | 04 | 2010 | Utilize higher efficiency lamps and/or ballasts | $733 | $2,755 | |
| OK0792 #03 Y:2010 | 03 | 2010 | Install compressor air intakes in coolest locations | $469 | $275 | |
| OK0792 #02 Y:2010 | 02 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $959 | $750 | |
| OK0792 #01 Y:2010 | 01 | 2010 | Recover waste heat from equipment | $2,543 | $3,114 | |
| OK0682 #13 Y:2003 | 13 | 2003 | Begin a practice of predictive / preventative maintenance | $1,600 | - | |
| OK0682 #12 Y:2003 | 12 | 2003 | Add equipment/ operators to reduce production bottleneck | $15,392 | $10,000 | |
| OK0682 #11 Y:2003 | 11 | 2003 | Reduce illumination to minimum necessary levels | $1,729 | $130 | |
| OK0682 #10 Y:2003 | 10 | 2003 | Use optimum size and capacity equipment | $2,483 | $1,200 | |
| OK0682 #09 Y:2003 | 09 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $892 | $438 | |
| OK0682 #08 Y:2003 | 08 | 2003 | Recover waste heat from equipment | $4,455 | $2,134 | |
| OK0682 #07 Y:2003 | 07 | 2003 | Upgrade controls on compressors | $3,374 | $15,000 | |
| OK0682 #06 Y:2003 | 06 | 2003 | Insulate bare equipment | $132 | $92 | |
| OK0682 #05 Y:2003 | 05 | 2003 | Utilize higher efficiency lamps and/or ballasts | $419 | $3,000 |