Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0415 #06 Y:2022 Increase efficiency of trucks $15,778 $12,180
MI0415 #05 Y:2022 Change rate schedules or other changes in utility service $142,120 $2,400
MI0415 #04 Y:2022 Optimize plant power factor $4,830 $7,950
MI0415 #03 Y:2022 Replace boiler $73,846 $170,000
MI0415 #02 Y:2022 Lower temperature during the winter season and vice-versa $10,767 $960
MI0415 #01 Y:2022 Install occupancy sensors $10,535 $3,084
MI0371 #07 Y:2019 Utilize energy-efficient belts and other improved mechanisms $210 $407
MI0371 #06 Y:2019 Install occupancy sensors $473 $325
MI0371 #05 Y:2019 Install soft-start to eliminate nuisance trips $1,638 $2,460
MI0371 #04 Y:2019 Reduce illumination to minimum necessary levels $2,708 $1,275
MI0371 #03 Y:2019 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $4,458 $5,640
MI0371 #02 Y:2019 Install vinyl strip / high speed / air curtain doors $8,462 $820
MI0371 #01 Y:2019 Clean or color roof to reduce solar load $9,343 $7,557
MI0160 #07 Y:2007 Use optimum size and capacity equipment $5,440 $3,411
MI0160 #06 Y:2007 Reduce the pressure of compressed air to the minimum required $6,319 $24
MI0160 #05 Y:2007 Utilize higher efficiency lamps and/or ballasts $7,705 $17,226
MI0160 #04 Y:2007 Utilize a less expensive cooling method $11,340 $15,475
MI0160 #03 Y:2007 Utilize sensors controlling roof and wall openings $16,476 $474
MI0160 #02 Y:2007 Use optimum size and capacity equipment $22,048 $8,641
MI0160 #01 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $20,466 $1,032