1,616
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AM0551 #06 Y:2008 | 06 | 2008 | Make a practice of turning off lights when not needed | $3,800 | $1,000 | |
| AM0551 #05 Y:2008 | 05 | 2008 | Improve handling practices | $5,090 | $110 | |
| AM0551 #04 Y:2008 | 04 | 2008 | Check for accuracy of utility / power meters | $6,600 | $5,000 | |
| AM0551 #03 Y:2008 | 03 | 2008 | Use most efficient type of electric motors | $13,330 | $12,480 | |
| AM0551 #02 Y:2008 | 02 | 2008 | Utilize higher efficiency lamps and/or ballasts | $18,950 | $32,300 | |
| AM0551 #01 Y:2008 | 01 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $42,500 | $1,550 | |
| UW0021 #06 Y:2008 | 06 | 2008 | Install occupancy sensors | $478 | $450 | |
| UW0021 #05 Y:2008 | 05 | 2008 | Reduce the pressure of compressed air to the minimum required | $3,472 | - | |
| UW0021 #04 Y:2008 | 04 | 2008 | Use or replace with energy efficient substitutes | $5,612 | $50,000 | |
| UW0021 #03 Y:2008 | 03 | 2008 | Use adjustable frequency drive or multiple speed motors on existing system | $9,357 | $5,912 | |
| UW0021 #02 Y:2008 | 02 | 2008 | Operate boilers on high fire setting | $20,223 | $49,000 | |
| UW0021 #01 Y:2008 | 01 | 2008 | Use waste heat from hot flue gases to preheat incoming fluids | $52,486 | $175,000 | |
| MS0330 #09 Y:2008 | 09 | 2008 | Utilize energy-efficient belts and other improved mechanisms | $442 | $2,040 | |
| MS0330 #08 Y:2008 | 08 | 2008 | Use adjustable frequency drive or multiple speed motors on existing system | $631 | $4,158 | |
| MS0330 #07 Y:2008 | 07 | 2008 | Install compressor air intakes in coolest locations | $1,094 | $1,050 | |
| MS0330 #06 Y:2008 | 06 | 2008 | Utilize higher efficiency lamps and/or ballasts | $1,629 | $8,225 | |
| MS0330 #05 Y:2008 | 05 | 2008 | Repair and eliminate steam leaks | $2,517 | $94 | |
| MS0330 #04 Y:2008 | 04 | 2008 | Utilize higher efficiency lamps and/or ballasts | $6,975 | $17,657 | |
| MS0330 #03 Y:2008 | 03 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,253 | $401 | |
| MS0330 #02 Y:2008 | 02 | 2008 | Analyze flue gas for proper air/fuel ratio | $15,879 | $1,000 |