Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,616

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Bakeries and tortilla manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0013 #06 Y:2023 Turn off equipment during breaks, reduce operating time $20,579 -
SJ0013 #05 Y:2023 Eliminate or reduce compressed air usage $733 -
SJ0013 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $3,556 $4,600
SJ0013 #03 Y:2023 Maintain air filters by cleaning or replacement $28 $235
SJ0013 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $2,372 $104
SJ0013 #01 Y:2023 Use solar heat to make electricty $47,814 $107,262
LT8391 #03 Y:2023 Install occupancy sensors $347 $50
LT8391 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $224 $2,775
LT8391 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,708 $600
SF0612 #07 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $8,468 $41,738
SF0612 #06 Y:2023 Use flue gases to heat process or service water $21,923 $54,880
SF0612 #05 Y:2023 Use optimum thickness insulation $106 $151
SF0612 #04 Y:2023 Isolate hot or cold equipment $3,665 $4,130
SF0612 #03 Y:2023 Replace fossil fuel equipment with electrical equipment $73,026 $18,461
SF0612 #02 Y:2023 Keep doors and windows shut when not on use $175 $59
SF0612 #01 Y:2023 Install vinyl strip / high speed / air curtain doors $2,332 $226
UU0239 #06 Y:2023 Reduce the pressure of compressed air to the minimum required $3,011 $3,011
UU0239 #05 Y:2023 Turn off equipment during breaks, reduce operating time $3,050 $1,400
UU0239 #04 Y:2023 Insulate bare equipment $6,144 $7,887
UU0239 #03 Y:2023 Shut off cooling if cold outside air will cool process $9,905 $9,905