Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Poultry processing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0543 #06 Y:2023 Use properly designed and sized hvac equipment $2,075 $13,169
LE0543 #05 Y:2023 Replace existing hvac unit with high efficiency model $2,200 $9,000
LE0543 #04 Y:2023 Insulate bare equipment $210 $760
LE0543 #03 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $4,298 $8,400
LE0543 #02 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $1,597 $3,000
LE0543 #01 Y:2023 Reduce the pressure of compressed air to the minimum required $839 $100
SU0164 #14 Y:2003 Install compressor air intakes in coolest locations $198 $150
SU0164 #13 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $462 $29
SU0164 #12 Y:2003 Turn off equipment when not in use $550 -
SU0164 #11 Y:2003 Utilize higher efficiency lamps and/or ballasts $723 $608
SU0164 #10 Y:2003 Insulate glazing, walls, ceilings, and roofs $847 $1,744
SU0164 #09 Y:2003 Increase amount of condensate returned $1,293 $955
SU0164 #08 Y:2003 Analyze flue gas for proper air/fuel ratio $3,485 $700
SU0164 #07 Y:2003 Redesign process $6,861 $270
SU0164 #06 Y:2003 Install wind powered electric generator $7,910 $10,000
SU0164 #05 Y:2003 Reduce hot water temperature to the minimum required $8,721 -
SU0164 #04 Y:2003 Utilize higher efficiency lamps and/or ballasts $13,096 $55,580
SU0164 #03 Y:2003 Utilize a less expensive cooling method $30,000 $76,518
SU0164 #02 Y:2003 Use optimum thickness insulation $115,419 $348,540
SU0164 #01 Y:2003 Install wind powered electric generator $141,258 $1,171,875