Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

14

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fruit and vegetable preserving and specialty food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0259 #06 Y:2024 Install common header on compressors $3,995 $9,200
UU0259 #05 Y:2024 Store heated/ cooled water for use during peak demand periods $53,643 $33,000
UU0259 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $68,165 $110,030
UU0259 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $205,038 $1,865,253
UU0259 #02 Y:2024 Use solar heat to make electricty $221,450 $2,473,450
UU0259 #01 Y:2024 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $3,866,540 $17,885,484
UU0179 #08 Y:2021 Insulate bare equipment $345 $747
UU0179 #07 Y:2021 Reschedule plant operations or reduce load to avoid peaks $617 $50
UU0179 #06 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,013 $6,614
UU0179 #05 Y:2021 Lower temperature during the winter season and vice-versa $1,131 $100
UU0179 #04 Y:2021 Install vinyl strip / high speed / air curtain doors $1,472 $8,300
UU0179 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,891 $1,233
UU0179 #02 Y:2021 Use a less expensive method of waste removal $27,935 $2,000
UU0179 #01 Y:2021 Add equipment/ operators to reduce production bottleneck $72,600 $4,000