Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

195

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0279 #07 Y:2025 Use solar heat to make electricty $49,660 $460,010
UU0279 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,760 $1,400
UU0279 #05 Y:2025 Insulate bare equipment $1,050 $2,860
UU0279 #04 Y:2025 Reduce hot water temperature to the minimum required $8,900 $4,720
UU0279 #03 Y:2025 Repair and eliminate steam leaks $5,400 $15,580
UU0279 #02 Y:2025 Replace fossil fuel equipment with electrical equipment $119,920 $620,000
UU0279 #01 Y:2025 Purchase gas directly from a contract gas supplier $92,200 $14,000
UU0259 #06 Y:2024 Install common header on compressors $3,995 $9,200
UU0259 #05 Y:2024 Store heated/ cooled water for use during peak demand periods $53,643 $33,000
UU0259 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $68,165 $110,030
UU0259 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $205,038 $1,865,253
UU0259 #02 Y:2024 Use solar heat to make electricty $221,450 $2,473,450
UU0259 #01 Y:2024 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $3,866,540 $17,885,484
UU0257 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,252 $5,785
UU0257 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $4,182 $19,121
UU0257 #03 Y:2024 Use solar heat to make electricty $26,762 $79,343
UU0257 #02 Y:2024 Increase use of automation $2,630 $12,300
UU0257 #01 Y:2024 Recover heat from exhausted steam, hot air or hot water $9,024 $16,577
UU0239 #06 Y:2023 Reduce the pressure of compressed air to the minimum required $3,011 $3,011
UU0239 #05 Y:2023 Turn off equipment during breaks, reduce operating time $3,050 $1,400