Search Assessments
ITAC logo
Search Assessments
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18 matching assessments
ARC 2+ Digits Required
NAICS Electrical equipment, appliance, and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Year Products Rec's Plant Energy $/yr Rec'd Savings $/yr
CC0020 2023 Low and medium voltage switchgears, lighting panel, limit amp 12 $1,070k $162k
CC0004 2022 Commercial lighting fixtures 3 $242k $56k
CC0001 2022 Surface mounted door closers and electro-mechanical door closers (operators) 6 $581k $82k
NC0662 2021 Power line components 7 $736k $122k
NC0592 2017 Coxial cable 6 $89k $37k
NC0575 2016 Fiber optic cables 6 $55k $23k
NC0571 2016 Fiber optic cable 10 $794k $160k
NC0538 2015 Motors 8 $343k $41k
NC0528 2014 Motors 9 $1,235k $19k
NC0515 2014 High voltage cable 9 $468k $41k
NC0488 2013 Elevator cable 8 $554k $103k
TT0099 2012 Medium voltage contactors, motor controllers, and variable frequency dri 3 $900k $30k
NC0449 2012 Ovens and ranges 6 $1,753k $53k
NC0430 2011 Electrical wiring devices 7 $1,628k $62k
NC0418 2010 Medium voltage transformers 7 $873k $305k
NC0385 2008 Medium voltage protection equipment 8 $101k $10k
NC0371 2007 Fiber optic cable 11 $1,111k $277k
NC0309 2004 Fiber optic cable 5 $658k $118k